Description
Project description: A system of 240 solar panels has been installed on the roof that sustainably generates the total electricity consumption, allowing the workshop and machines to run entirely on their own solar energy and reducing CO2 emissions.
Description of the organisation
The company has installed 240 solar panels on the roof that generate more than 61.500 kWh of green electricity per year. As a result of this installation, projects are completed more sustainably, and all machines in the workshop run entirely on self-generated solar energy. The installation was carried out by Mensonides Installatie from Harlingen.
- 240 solar panels
- 67.200 Wp power
- 61.500 kWh yield per year
- 22.126,44 kg CO2 savings per year
- Equivalent to planting 1.054 trees per year
Skills suitable for this job type
audiovisual techniques and media production
management and governance
math
statistics
design and management of databases and networks
development and analysis of software and applications
environmental protection technology
electricity and energy
electronics and automation
mechanics and metal
Disclaimer
The text of this vacancy has been rewritten using AI for the sake of uniformity and readability. You can always consult the original vacancy text via the view at the top of this page or on the source page (accessible via the “Apply directly” button). No rights can be derived from the presentation and content of the above vacancy on this site.