Work Planner E
Description
As a Work Planner, you contribute to the optimal operation of the Waste-to-Energy Plant and the Plastic Sorting Plant. You are part of the Work Planning team within the Maintenance department and work in a varied, dynamic process environment. Safety and compliance with safety, quality, and environmental regulations are your top priority.
Job requirements
- Completed relevant technical education at MBO-4 level, preferably electrical or installation technology.
- Knowledge of SAP.
- Experience in a process environment.
- Affinity with cost control.
- Extensive knowledge of technical installations and the ability to calculate the costs and time of maintenance work.
Tasks
- Preparing, planning, and having maintenance and repair work, overhauls, and modification work carried out.
- Preparing work orders and ensuring that personnel and materials are contracted and scheduled on time.
- Planning preventive maintenance and proposing improvement actions to minimize maintenance costs.
- Preparing cost estimates and final calculations and generating reports on maintenance and repair work.
- Participate in projects and act as a driving force for MOCs (management of change).
- Ensuring compliance with safety, quality, and environmental regulations by yourself, colleagues, and third parties.
Working conditions
- 25 days of vacation and 13 ADV days.
- pension scheme.
- End-of-year bonus of 5,5%.
- Travel allowance of 0,23 net per km.
- Development and career advancement opportunities with room to further develop yourself.
Description of the organization
The core activities at the Wijster site include waste separation, recycling, energy production from waste incineration, anaerobic digestion, composting, regranulate production, water purification, and landfilling. Waste arrives by truck for processing; in separation plants, metals, plastic packaging materials, and beverage cartons are separated and recycled. The organic fraction from residual waste is anaerobic digestion into biogas, films and plastics are sorted in the plastic sorting plant, and films are converted into regranulate in the polymer recycling plant. Remaining waste is incinerated in multiple incineration lines to generate electricity and steam, a portion of which is supplied to an adjacent Energy Transition Park. The site also houses a large anaerobic digestion plant and a composting plant for organic waste; the biogas is upgraded to biogas and injected into the gas grid. There is a separate anaerobic digestion plant for the processing of the wet organic fraction. The landfill is partially covered and partially used for landfilling; To this end, landfill gas is extracted, upgraded to natural gas quality, and pumped into the regular grid as green gas. Furthermore, there is a large water treatment plant for purifying water from the landfill and the site.